Rannoch Weir

 

Kinloch Rannoch Weir

Enterprise Engineering Services Limited have retained KGAL to provide design and detailed manufacturing drawings for replacement gates on Kinloch Rannoch Weir. The weir structure forms part of Scottish and Southern Energy's Tummel Hydro Scheme.

Three gates will be replaced, each gate being 40 foot span.

An initial site survey was carried out to determine existing design parameters. KGAL's design scope includes seismic and fatigue analysis.

 
 
1
Glendoe hydro scheme
Rannoch Weir
Radial gates refurbishment at Aigas and Kilmorack
Automatic tilting weir gates, Bonnington
Stainless steel smolt screen, Cassley Intakel
Bulkhead gates, Cruachan
Radial gates, Derbendi-Khan
Fishbelly gate design, Dolgarrog
Radial gates, Dundreggan
Intake gates, Earlstoun
Replacement trash screen, Invergarry
Water control Gates at Nathpa
1
 
Home
Ports & Marinas
Flood Defence
Hydro Power & Dams
Trashracks & Screens
Radial Gates
Wheel Gates
High Pressure Slide Gates
Stoplogs
Hydro Turbines
Moving Bridges
Careers
About Us
News

© 2012 KGAL - Mobile Version

www.intergage.co.uk