Nakdong 22

 

Nakdong, Korea

7 - Rising Radial Gates 40m Span x 9 Deep x 700 Tonnes.

Each gate is operated by a series of hydraulic motors running a pin rack and pinion system, at each end of each gate, controlled from a central barrage control station.

As part of the South Korean Government’s ambitious 4 Rivers Project, the Nakdong 22 Barrage is under construction and due for completion during early 2011. KGAL have been retained by Hyundai Engineering as specialist Gate and M&E consultant to provide final designs of the gates and operating machinery.

KGAL’s work scope includes checking the Client’s outline design, modifying the design where necessary, FEA and CFD of the gate structures, hydraulic simulation of the operating system, provision of design warranty, works inspection and site supervision.

 
 
1
Carpenters Lock
Yeongsan
Colne Barrier
BalaLake
Minworth Radial Gate
Thames Barrier
Sawley
Eastern Barrier
Han River
Nakdong 22
Cley Gates
Fishbelly gate design, Abbey Mill
1
 
Home
Ports & Marinas
Flood Defence
Mitre Gates
Fishbelly Flap Gate
Flood Defence Gates
Radial Gates
Bascule Gates
Rising Sector Gates
Sector Gates
Tilting Gates
Wheel Gates
Hydro Power & Dams
Hydro Turbines
Moving Bridges
Careers
About Us
News

© 2012 KGAL - Mobile Version

www.intergage.co.uk