Cassion gates
 

Milford Docks Caisson Gates

Cassion Gates had originally been installed at the entrance to Milford Docks in 1886. By 1994, these cassion gates had had several refurbishments and control modifications, but had reached the end of their useful lives.

Acer Wallace Evans Ltd (now Hyder Consulting Ltd) in association with Kenneth Grubb Associates Ltd were appointed to design replacement cassion gates together with the related civil engineering and electrical control works.

The scope of the work included the development of a full specification, together with the complete structural design of the new cassion gate leaves and pedestrian walkway. After a round of competitive tendering Ravestein BV of Holland were contracted to manufacture and install the works.

Kenneth Grubb Associates Ltd played an active part in the detail design approval as well as progress inspections and site installation.

CLIENT: Docks Company Ltd

LEAD CONSULTANT: Hyder Consulting Ltd, Penarth

GATE CONTRACTOR: Ravestein BV

 
 
1
Grangemouth
Bristol
Oman
Boston
Buryport Harbour Tilting Gate
Daventry Canal
Port of Barrow
Ro-Ro Linkspan, Douglas Harbour
Seacat pedestrian access gate, Folkestone
Automatic Tilting Gate, Elizabeth Marina, Jersey
Tilting Dock Gate, KFAS
Caisson Gate re-furbishment, Milford Docks
1
 
Home
Ports & Marinas
Sector Gates
Mitre Gates
Tilting Gates
Ro-Ro Equipment
Flood Defence
Hydro Power & Dams
Hydro Turbines
Moving Bridges
Careers
About Us
News

© 2012 KGAL - Mobile Version

www.intergage.co.uk