Trained
as a Mechanical Engineer via four-year full time Bachelors course at Chongqing University
and two year full time Masters course at BrunelUniversity.
Undertook
a number of Technical Positions of increasing responsibility in the Design
Engineer field.
Worked
for a period as a University Lecturer teaching at Chongqing College of Power
Engineering teaching mechanics and supervising engineering design projects.
Considerable
experience gained in the field of structural stress/strength analysis, Finite
Element Analysis as applied to a wide variety of engineering structures and
designs;
Joined Kenneth Grubb Associates in 2002 to
concentrate on Consulting Engineering work in the water-engineering field.
Additional
Information:
Elected to Member of the Institution of Mechanical Engineers (with the
designatory letters CEng MIMechE) in July 2004, membership no. 80052711
Papers Published:
Load
analysis with varying mesh stiffness, Computers &Structures (International Journal), Vol.70, No.3, 1999.
Errors
of transmission of loaded gears, the Third World Conference on Integrated
Design &ProcessTechnology, Berlin, Germany,
6-9 July, 1998.
Structural
optimisation based on mass redistribution, Proceedings of International
Conference "Energy Week'96"(Incorporating ASME's Conference &
Exhibition). Houston, Texas, USA,
January 29 - February 2, 1996.
Optimisation of dynamic behaviour of mechanical
structures, The Second World Conference on Integrated Design & Process
Technology, Austin, Texas USA, 1-4 December, 1996.
Structural development of the operating equipment for a vehicle lifting bridge proposal for the Borough of Poole. The drive equipment was oil hydraulic based.
Peel Harbour Swing Bridge
Structural development, operating equipment and bridge structure detailed strength calculations for a swing bridge at Peel Harbour, Isle of Man.
The drive equipment was oil hydraulic based.
Dutch River Swing Bridge
Retained by Jacobs Babtie to carry out CAT III checking on the Dutch River Swing Bridge.
Iraq Lifting Bridge
Retained by Mabey Johnson to design a winch operating system for a lifting bridge complete with all necessary drives, limit switches, buffers and controls.
Middle East Bridge
Following "BS 5400 Part 2 steel, concrete and composite bridge (specification for loads)", to undertake the outline concept structural design for a long span swing rail bridge for Middle East. Work involved load case definition, concept structural design and calculations.
Exeter Bridge
Calculation of the operational torque requirements for the swing bridge and checking of the pedestrian bridge structural strength.
Swansea Waterfront Retractable Bridge
Structural development, bridge structure and detailed strength calculations for a retractable bridge at the Swansea Waterfront.
Rodd's Canal Lifting Bridge
Calculations for the oil hydraulic operating system for a lifting bridge in Bude, Cornwall
Tianjin Lifting Bridge CAT 3 Checking
The provision of category three check on mechanical systems for Tianjin Bridge. The bridge is for a 60 metre clear span in China. Each bridge section is 1500 tonne in weight.
Derby Swing Bridge CAT 3 Check
The provision of a Category three check on the design of a pedestrian swing bridge to be installed in Derby.
Milford Haven Tilting Gate
Retained by Hyder Consulting Limited to undertake structural analysis of a semi-buoyant tilting gate. Work involved the development of loading criteria, foundation calculations and a finite element study on the structural performance of the gate and its connections. Development of a special bearing to support the gate whilst not allowing structural forces to be transmitted.
Blackwater Dam Intake Gate
Retained by Enterprise Engineering Services Limited to undertake a structural survey of a hydroelectric intake gate. Work involved the gate structural calculations based on surveyed data. The study helped to assess the gate structure's residual lifetime.
Blackwater Intake Canal Cofferdam
Retained by Enterprise Engineering Services Limited to undertake the structural calculations for the design of a new two-piece cofferdam to isolate both the canal and intake.
Kilmorack Radial Gate
Retained by Enterprise Engineering Services Limited to undertake a finite element analysis of a radial gate structure. The work involved the substitution of surveyed material thicknesses in order to determine the residual life of the structure.
Leigh Barrier Radial Gate
Retained by Environment Agency through Babtie, Brown & Root to undertake an analysis for the whole structure using finite element analysis. The work involved the structural analysis of the existing centre gate and north and south gates respectively. Based on the analyses, a gate strengthening proposal was proposed and analysed using FEA.
A set of manual calculation was also carried out to determine the strength of the gate lifting system, hinge bearings and all structural members.
Bonnington Surge Tank Gates
Retained by Enterprise Engineering Services Limited to undertake a structural analysis for two gates.
Stonebyres Tilting Weir Gate
Retained by Enterprise Engineering Services Limited to undertake a structural analysis and FEA for the tilting weir gate, counterbalance and adjustable pulley wheel system.
Al Khiran Sector Gate and Flap Gate
Undertake a structural analysis and FEA for both sector gate and flap gate.
Swansea Sector Gate
Undertake a structural analysis and FEA for the sector gate.