Oman
 

Oman Basin Gate

Basin Protection Gate Equipment

Bottom hinged gate 24.4m Wide x 12m deep x 160 Tonnes; Electric Hydraulic Rope winch operation; Hydraulic push off ram; Hydraulic operated bypass sluice

KGAL Work Scope

Inspection and commissioning of Unstepping equipment; Supervision and control of Unstepping operation, including; Preparation work by Divers; Setting to work of Unstepping equipment; Planning of Unstepping operations to suit tidal conditions; Supervision of Unstepping operation; Control of gate buoyancy during towing; Berthing of gate on Ship lift; Inspection of Gate structure and preparation of report for refurbishment; Inspection of Hydraulic operating and Electrical control equipment and preparation of report for refurbishment

Notes - The gate was installed in 1985; It was originally designed by KGAL Engineers; It is semi buoyant during operation with permanent buoyancy chambers and internal tidal chambers; The gate had to be removed during the hours of darkness to suit tidal times and levels

CLIENT:Said Bin Sultan Naval Base, Wudam As Sahil, Oman

 
 
1
Grangemouth
Bristol
Oman
Boston
Buryport Harbour Tilting Gate
Daventry Canal
Port of Barrow
Ro-Ro Linkspan, Douglas Harbour
Seacat pedestrian access gate, Folkestone
Automatic Tilting Gate, Elizabeth Marina, Jersey
Tilting Dock Gate, KFAS
Caisson Gate re-furbishment, Milford Docks
1
 
Home
Ports & Marinas
Sector Gates
Mitre Gates
Tilting Gates
Ro-Ro Equipment
Flood Defence
Hydro Power & Dams
Hydro Turbines
Moving Bridges
Careers
About Us
News

© 2012 KGAL - Mobile Version

www.intergage.co.uk